上海外卖私人工作室

Add more than 3,000 parking spaces to Guangying area to dig the courage to rely on the parking space

Since the study of party history, there has been an important part of the parking area to govern the parking area, relieve parking is an important part of the people’s practical practices. According to the characteristics of the people, according to the local system, there is more than 3,000 parking spaces, and the parking of the area is fully enhanced. Order, smooth residents travel road. There are many residential communities in Guangying area, but the original planned parking space in some cells cannot meet the current parking needs of residents, leading to disorder parking, traffic order chaos and other phenomena.

In order to alleviate the difficult parking, the Guangying area will carry out roadside parking in 13 communities such as Jasu, Ziyuan, Qingyou Park, involving 20 roads such as Qingyuan Road, Lihuiqiao East Road, Jinfang North Street. Take a total of 3045 parking 上海楼凤论坛 spaces. The area also introduces Chaoyang Parking Management Co., Ltd., integrated with the roadside parking space, etc. "In the past, Qiu Surong Street was seriously parked.

Now, the parking space is increased, and the parking has also become specified, and the travel is much more than before. "Mr. Wang, the resident of Ziyiyuan Community, said to the Guangying area, also use the corner, digging the dive parking space. Beijing line (Guangying section) is adjacent to Guangying District Beiyuan Home Community, the community consists of 6 communities, There are many people who live in a large community. It is a large community. The parking is already a "heart knot" for many years. When conducting environmental synthetic governance along the Beijing-Bao Line (CV), the Guangying area combines the 阿拉爱上海sh419 surrounding area, planning parking Bit. "After a preliminary visitor, cooperate with expert argument, it finally decided to harde the concrete pavement in the south side of the cultural wall, plan to plan 500 parking spaces.

"Hu Yongfeng, the relevant person in charge of the Guangying area, has an entrance and export in the north and south side of the parking lot, in order to prevent the vehicle from closing traffic, and safeguard the safety of the residents in the parking lot, the two sides of the parking lot are installed. Marble isolation pier. At the same time, the ground is applied to the white arrow passage logo. The entry and entering the vehicle can be on an orderly manner. At present, the parking lot has been completed, and the monitoring is installed.

(Dong Wenhui) (Editor: Bao Congying, Gao Xing) Share let more people see.